Show cable roads preparing forr or brot rot the cable road company are already preparing for winter when the road was built due dm allowance was made for the expansion and contraction of the ironwork itself caused by heat and cold buethe pressure on oil the rails raila caused by the same agencies seems to have been entirely foro forgotten gotten tile first cold snap of winter brought any quantity of trouble to the company it f froze roze the afie rain and scow mow water which had been allowed to 10 settle in tho the spaces between bet pen tile the paving stones lying between the ra rails il s and the iron forming tile the slot through which the grips pass the clones stones spread faither and farther fir af art artand aind pressing 0 against t t the lie ironwork closed up the slot so effectually that the grips were gripped fit turner mer than they ever clasped tile cable and aid the load was blocked completely until gangs of men tore tip rp tile pavement at vario various I 1 JOll points ts and pried the slot pen open with ere cro bars bare tho company are now busily edgag engaged cd relaying tile pavement rw pax ement between tho hacks I 1 leaving earin considerable ara briaco co between tile stories these spaces n c fint crt fill filled d with grainland grai gravel eland and finally run au full of hot pitch as possible in tho the hope tb diat atwater water will find no space to lodge and in this winter new kew york evenin evening sun |