Show the lical r artl bridge I 1 c the alie 19 L lie ile the ilia following 81 description of the bridge the wv bridge is a handsome hindson me and durable structure it liar hav two deek deck spang spain 13 43 feet each boiler riv tad grider grid cr R 1 I 1 feet in darl h tup cup ported on oil three fine stone plure 18 16 feet long iong 0 5 fe test t broa and 2 21 1 feet high the in onry if i of grey lava from the coiTt pa ays quarry at t black rock it is ia copl copil co pl wilh reth re th grey grev sn danl 1 stolle front from the 1 D A 11 it 11 G quarry at castle gate tho pieris pier rest on 85 piles I 1 foot in diameter and driven 25 feet through 0 a quick sand Ilott oln inton into s haril substratum sub stratum theae aro are c appod with 1212 12 12 inch timbers on which is spike sli kel 1 it ai 6 aich plank floor tin the depace between the CAPS 15 filled with furnace furn ce slag rammel 1 and snug siu up to tho the floor bottom bot tolu on this thi and the capi the floor has hai perfect learing bearing the floor door i is is IS 18 inches below belo v the lowest water to insure against atmospheric infill anees the inas masonry onry rests on oa do floor bloor and is avid in regular courtna the least of which is 12 inches thick reds beds and joints are arc all dressed and faces pitched tile th bridge was wa designed by A F I 1 Dor cinns engineer 0 of f the alic road the masonry was built by bation bros and the graders were mado by coolidge Coolid gc C Us D 0 of f chicago th ivas con com plated everal leveral L days since and tin tile the gri grigerit derit arrived yester yesterday dry |