| Show RED AD Jt G OP OPENS S ff rINE t ORE OAf BOOr The Tue Snake Shaft Is All In lii Ore a as asAre Arc Are AI Also o the lie Drifts in en th the 10 Foot Le e cl clOHE ORE OHE BINS FILLING UP FAST B mie Mine lime lug Pine to 11 nod Will 11 Soon be e a u la Heavy Pro Producer d ii c r of ot ih th the lt lied Hit d II f fInly lit Is happy then the d cRY days y over tile the way war tl time mine mini I Is II I e to development tl A Afine Afine fine lne quality of IC ore hag baa been heen op ol m 1 Illin up lp In tIme tho til level of th the Snake hal Drifts Its have been len run tun each lAch altie of or all 11 f fuel feet st und cud the time bottom of ot the 1 und bal back beh shafts iii me ni in ole oio The lle work oik of ot IP opening up nIl II the time bod body I Is In II every way n ay and ali It I In to 11 hoped that will willbe willbe 1 be started In II the future AM An It le is lethe th the or Ir bint mit lt t thi til mine ero Iro filling UI up fast tul though the only ml ore ole being handled at ut th time til time comen lome In Iii II tIme the way a of ot len Heavy will willbe wil be bp tIme the D rile i of I time the da day In III tim th tin J n neal ni U In l The mine I le I nicely to 10 In II other othel in fact tact It IH lit in Ill II tin the best beet producer ol to 10 make lae of oC It I a D big |