Show electric equipment for moscow now hoisting equipment that will bo be operated by electric current lini hm boon been ordered by tho the moscow company and will be received and installed within tile tho next 30 bayst ft when an tl eliat I 1 nt is accomplished complis hed hod the now neu shaft wilp bo be deepened feet below the present depth of feet this win wih he equal to 1400 feet depth in the old workings A now new strike of ore has haa been made in the down 15 feet below the old workings where the ore body was found to bo be faulted it is ia beli believed evel the new find is a continuation of tho the old oro ore body bode from which dividends were earned in tho the past ore is being shipped at the rate of about 20 carloads a month and is bringing good re turns the values running from 31 to 55 ounces silver to tile tho ton with 28 to 32 per cent lead tile tho company has haa acost cash surplus which is being added to each month mining news |