Show work on the panama canal washington substantial progress in canal construction all along the line Is shown by reports coming to the washington office of the isthmian canal company excavation w work ork approximates cubic yards elmost as much as the total quantity of bf dirt taken out by the french dur ing the period they were engaged in operations there less than cubic cable yards of earth remain to be removed from flom the ditch it la Is esti mated the great waterway will bet ba ready for the transit of ships by janav ary atry 1 1915 |