Show A VI il to W Will 1 atif nt cean itald solvieg il awn arime buildt rigs haalil lir i lor lo R been cc u tell is s dall tl V strong bild lild dillaby dicye di abl iye tile fill iner has birly on oil tie roii nl liona ions their construct construction iou offers if for lini liling with his own hand dinall shed etc quickly itald ambli at ht cot cost j ru it i small addition to ill it ii hay beaure is but 1 I PLAN OF deferred boca because tue the ilia only carpenter cir penter in iii ilia place is not tit liberty an extension fora lor would often be ba built if tile ali owner coull could ilo it without expense fur for ext ra hicl p but j lut how to go to work is the icil question stion alie thought of getting outa out ii f ranie is a bug ir to most men not carpenters now the tha plan lii of building which coni com inniss itself in ill tho the eng engraving lequire s no framing fram iii with S 8 posts 31 1 feet lon long cut in the alio woods aind hewed ca 1 I olle one side mile of the upper IS 18 inches and ami ilich plink plank the owner can call erect it i shod avati it in to or extension as quickly 1 and ild sul sub Milti ally aenny ns ciny carpenter with fit alio i old moi frame or in cidern one tin till posts must lu be set 4 feet anait and 2 feel in III the earth if the spot hosen chosen is not well drained the gioles should bedas below host lhost level urd filled towi to within thill two feet ot of the surface with rock boulders bowl ders on oil v inch to stand the posts the uprights iri ailts lor for ill nil I 1 silles for no c orner costs of we weight gh t ird are required nie me spiked to the outer r frides of these choit pieces set in the earth inide of the tl a uprights resting on oil the heads of tle tile posts another plank is id spiked both down and to the standards tile joists foists null and plates tire lire also spiked in ill lido aid 3 the uprights in the same saine manner as the clio all ill pieces covered with novelty siding such a building is is as neat ind and well braced its as one can in desire if i vertical siding is to I 1 be e ned the uprights lits iro ire stood upon the ilia posts avile e t they licy are held in pl place ice by spikes and the sill pieces put on oil outside tile the joists foists and plates in this case have to be placed out outside sile the uprights tor for with the sill pieces they relive receive th vertical vertic nl siding if flooring be used it may inay lie be laid on oil timbers placed on the portion of the post heads still uncovered |