Show u o MOFFAT TUNNEL G CALL FOR FOIL MORE nox BONDS p Due to unforeseen conditions inthe iu in the the construction of t the the J V tunnel tun tun- v nel the commission in charge announced an an- announced nOl recently the flotation of or a second bond issue of oC Tho The previous issue was for Improvements will will willbo bo be necessitated because of unstable rock fo formations toi and the pl plans ns include tho the concreting of the passage t to keep leeel the tIle water from Crater lake lalee feet a above from seeping into the main mahi t nn t The concreting of the water v tunnel tun- tun tun tun- net nel will vill be for approximately f four lr 1 miles I |