Show POWER LINE NOW V OO BOTH nOTH PORTALS MOFFAT l TUNNEL The western 1 portal ortal of the he pioneer tunnel of or the Moffat project is Js in feet teet and with the Colorado Colorado Power company J lines les completed to both portals it is expected that before the tho end of th the week power will be be used in In drilling and tho the work thus further speeded up These two corn corn- completions com com- 30 days ahead of contract was made mado possible by the commission commission commis commis- sion slon when even before it was assured assured assured assur assur- ed of selling its bonds it entered into into a R contract for beginning g the power II lino The eastern portal now now is well under under un un- der cover and will wUl progress more rapidly from this time on Warehouses are compelled d at both portals and the work Of work of f storing machinery supplies and food for forthe forthe forthe the winter is s progressing Work has started on the building that will be be used Jointly for tor a commissary and I amusement amus melt h hall |