Show DRILLING RILLING IN DUCHESNE DUCHES DUCHES- NE FIELD TO START SOON krUTE kr b UTE TE PETROLEUM CO ACTIVE r i article Last week we carried an organization organization organization or or- the new giving a brief story o on Petroleum Petroleum Petroleum Petrol Petrol- known as the Ute lite eum eum Company In this thin tb 3 article w we of the organization give addition l tion and what's expected to happen inthe inthe in inthe the immediate future M at r. r P. P R. R G. G of the Porter treasurer secretary company has l n cen here ail week preparing preparing preparing pre pre- paring the wa way for the operating ope department de de- department which should be n On this field within the coning two t week week- we k jt The of the Ute Petroleum Peti oleum Company are Max W. W Ball Ban president president president I dent Frank Frantz vice president Robert G. G Porter treasur secretary i er er r C. C T T- T Lupton chief geologist and I director R R. R G G. G Taylor and R. R K Staley Staley Stal- Stal Stal-I Stal ey ey directors Robert Gibson field I superintendent Mr Gibson is expected expected expected ex- ex I here in the near future and will have charge of the drilling of the first w well for the Ute Petroleum Co I t While it is said that the there e is no connection between the Ute and the Matador the Matador has turned to the he Ute 76 75 per cent of all their holding hold hold- hol holding ing on the Duchesne structure The Theother Theother other ther they are holding in case of developement developement de de- de- de elopement of this structure into a producing field While the Ute te intends to operate in inmany inmany many sections of the country the Duchesne structure will be the first t to receive their ir attention Upon this structure they are pinning much of their hopes This belief in the Duchesne Duchesne Duchesne Du Du- Du- Du chesne structure of course is based upon n the favorable reports reports reports' of such geologist as Cline Lupton Davis Jones May Vaughn and many oth oth- ers ers I Equipment has been ordered forte forthe for forthe the t-e first well and i it is expected that It will twill be moved in during the coming cominb actual two two two-or or three weeks and that Trilling drilling wilf wilt start shortly after that ti time ne |