Show City Officials Prepare For Special Bond Election On Water mater Improvement Project Engineer Will Vill Address Townspeople To At Mass Meeting Next Nest Week Official List Shows Qualified Voters in Duchesne Duchesne city officials are busy this week preparing for the the bond election September 30 which will decide whether or not bonds are areto areto areto to be Issued for P. P W. W A A. improvements improvements improvements improve improve- ments to Duchesne's water works system Considerable Interest has been shown in the list prepared by County Clerk G. G A A. Goodrich of voters who may participate participate participate pate in the election According to the law only those who voted at atthe atthe atthe the last city election and who paid a property tax In 1938 are qualified quail fied fled to vote at the special bonde bond e election No qualification Is made as to whether taxes were paid on real or personal property but the tax must have been paid The official list as prepared by Mr Goodrich from the poll po books of the last election and the tax records In the county treasurers treasurer's office shows only qualified electors In Duchesne Project Explained The bonds to be voted on are proposed f for r issue to guarantee the city's share of a loan and grant P P. P W W. A. A project for tor improvement improvement improvement im im- provement to the city wat water r works in the amount of The total project with an estimated estimated estimated esti esti- mated cost of includes development of ot Murray Springs feet of ot pipe laid relaying feet teet of pipe now extending up the river to an unsuccessful filter bed 1280 concrete reservoir contingencies contingencies contingencies contin contin- 1500 and engineering fees 1360 Meeting Caned Called Because there Is some doubt among city among city officials and townspeople townspeople towns towns- I people alike aUke over the Murray i Springs area the proposed source I of supply for the water arrangements arrangements arrange arrange- men ments ts were made this morning with the project engineer Robert G G. Harding of ot Salt Lake City tomake tomake to tomake make a 0 a. a further investigation of the area next Wednesday After this inspection a mass meeting of the people will be held In the TownHall TownHall Town TownHall Hall Wednesday evening at 7 o'clock at which time the engineer and city co councilmen will further explain the project to those are Interested It is explained further that the project is so set up that should development of the springs prove them to be unsatisfactory or inadequate inadequate inadequate in in- adequate changes can be made inthe inthe in inthe the project to provide for tor another source of ot supply for the water |