Show STATE PlA PLANS JS T CONTINUE UN ON i ARCADIA ROAD Lowered Lovered Cost Of Snow Removal Allows More V Work ork ork Plans for continuing the grading grading grad grad- ing big and graveling of the state highway through Arcadia to the Lake Fork bridge were explained this week by Douglas Larsen District Engineer of the state road commission on a visit to the Uintah Uintah Uin Uin- tah Basin When contacted by members ol of the Duchesne Gateway Club Wednesday Wednesday Wednesday Wed Wed- in the hopes of having this work continued Mr Larsen stated that he had already planned planned planned plan plan- ned to go ahead with this project No definite time for the work has yet been set he stated pending weather conditions and other developments de de- To Continue Work orl Considerable work was done on the Arcadia road last fall including including including in in- several miles of grading and the la laying ng of river-bed river gravel grav grav- el on 26 miles extending north from the junction of the Arcadia- Arcadia roads He hopes to beable be beable beable able to continue this work as far faras faras as the Lake Fork bridge Mr Larsen Larsen Lar Lar- sen stated Lar j It was the opinion of Gateway Club members rs and concurred in iii iIiI by Mr Larsen that the mild winter winter win win- ter coupled with heavy traffic on the roads had eliminated much of the snow removal for which funds had been budgeted and that this money should now be available for maintenance and construction work |