Show POWER COMPANY COMPLETES COl NEW SUB STATION Another step in the power imProvement improvement improvement im im- provement program for Duchesne was reached Thursday when the theline theline theline line crew of the Uintah Power Light Company made connection to the new sub suh installed at the Duchesne river bridge The new station carries an additional additional additional ad ad- transformer bringing the efficiency of the station from about about about a- a bout 60 per cent to 90 per cent according to M. M E. E Lundberg company manager Installation of the new station makes possible the elimination of the volt line which has been extending into town and nd which has been the source of much trouble to the company an and 1 the citizenry It has been a constant constant constant con con- stant menace from fallen faIlen branches branches branches bran bran- ches and other forms of electrical electrical electrical cal short causing several of the past power failures and because of the high voltage carried has been the source of much radio interference Only 2300 volt lines will be carried beyond the sub stati static Mr Lundberg stated and because these are installed much of the former trouble will be eliminated ed ed |