Show Over Half Million In Work Funds Approved For Utah t. t FOUR PROJECTS IN DUCHESNE COUNTY CARRY FEDERAL FUNDS OF Large List Of Projects Submitted Later A Await vait Approval Form Formal l approval by President Roosevelt of Utah work relief projects calling for in federal funds and pledged d dby by sponsors was announced Tuesday Tuesday Tuesday Tues Tues- day from Washington D D. D C. C The announcement confirmed a tel telegram telegram tele tele- gram from Senator Elbert D. D Thomas to Governor Henry Henr H. H Blood Monday The list of approved projects forwarded by the United Press shows that the first batch of VP A undertakings will wiIl affect all sections sections sections sec sec- of Utah and included four projects for tor Duchesne county calling calling calling call call- ing for federal funds of and 1680 pledged by sponsors While no word of the approval h has s been received at the local relief relief relief re re- re- re lief offices Mr G. G V. V Billings manager of the local offices says work will be begun on the projects projects projects pro pro- as soon as official notice reaches Duchesne First List Incomplete In commenting on the projects approved Mr Billi Billings gs explained that thru an error in the district offices in Salt Lake City Duchesne Duchesne Duchesne Du Du- Du- Du chesne county's list of projects had hadnot hadnot hadnot not been submitted complete and that a long list of projects for forthe forthe forthe the county is now awaiting ap ap- ap- ap When the recent deadline for WP A projects was announced it was announced that only a small part of Duchesne county's list had been written up in the Salt Lake offices These were sent in and are the ones approved Fast work at the last minute on the part of Mr Billings and district engineer Wayman resulted in hi getting getting getting get get- ting the balance of the list submitted submitted submitted sub sub- and it is now awaiting ap ap- The four projects which have received the Presidents President's approval are Bluebell Grade Bluebell Grade and widen road to Upalco six miles repairing bridges Federal fund sponsors sponsor's contribution Roosevelt Drill two foot wells to secure more water for tor Continued on Page 8 Utah Work Projects Receive Approval Continued from page j 11 city Federal funds sponsors sponsor's sponsors sponsor's sponsors sponsor's spon spon- sors sor's contribution Talmage Improve to farm-to- market secondary roads Federal funds sponsors sponsor's contribution tion Duchesne county Instruction county Instruction in inand inand inand and supervision of construction of storage cellars and cisterns cisterns cisterns cis cis- cis- cis terns for of culinary Water water water wa wa- ter for Indians Federal funds Projects Awaiting Approval al Projects awaiting approval over 20 in to number include the following following following follow follow- ing Duchesne county sawmill and bridge construction project covering covering cover cover- ing repairs to all culverts and bridges in the county board feet of timber Umber to be milled hauled and placed Thirteen road draining grading and construction projects covering covering covering cover cover- ing the entire county particularly those by school busses Four projects in Roosevelt City including tennis court con truc- truc tIon asphalt pavement construction tion street repairs and repairs to cement sidewalks Three projects in Duchesne city including construction of a n civic center completion of swimming pool and a slough drainage and mosquito abat abatement ment project A school lunch project covering the preparation of hot bot dishes for 1000 students In schools throughout through through- out the county Mars Man Has tins Ice Laps Caps The polar l' l legions glons of or Mars mi nn believed to have t caps calIs welch much like the same regions legions of ot the earth |