Show Graveling Surfacing Completed On Road Duchesne To My Myton ton The contractors who had the tho contract for gravel surfacing the tho road from Duchesne to Antelope finished their work Saturday last The road from Antelope to Myton Myton Myton My My- ton had been n finished about two weeks ago As soon as the weather gets I warm warm oil will be applied to this mile 20 stretch of r road ad That will wil probably be about July 1st I An oil surfaced road from Duchesne Duchesne Duchesne Du Du- Du- Du chesne to My Myton ton will be a great improvement The section of road between My Myton ton and Roosevelt Roosevelt Roosevelt Roose Roose- velt will wiIl be the next section to receive re receive receive re- re a new coat of gravel v r I t |