Show Streets Will Get Seal Coat The Moab City offices announced ed this week that oil oU had been obtained and as soon as necessary necessary necessary sary amounts of gravel are stockpiled stockpiled stock stock- piled work would get underway on seal coating the city streets of Mon Man The Job which I Is aImed aimed aimed aim aIm- ed at bringing the city street strett system system I tem tern Into good repair and preventing preventing preventing prevent prevent- ing further deterioration will get underway sometime within the next month The city will be aIded aided aided aid aId- ed both financially and by men and equipment by Grand county Clark Tank Tant Lines will furnish oil for the job and end will also furnish a spreader Prior to seal seal- seal coating of the tho streets city crews will complete their work of filling chuck holes throughout the system According Accord ing lug to City Administrator Ellis Foote a double coat of the sealer scaler will be applied lo o 0 1st North and 1st South streets which carry a heavier load of traffic and are in itt fairly poor shape at the present time A large number of cuts outs across the made necessary by Improvements to the city oily waar r sewer and lines along with the installation of ot natural gas lines throughout the city have made tire fie toads extremely rough even though patching work was wag accomplished accomplished accomplished ac ac- when the cuts wore made Further deterioration was due to the extremely heavy amounts of moisture which have been present through the winter and spring coupled with the ever- ever Increasing traffic problem in Moab |