Show Attend Colorado River Water Storage Meet Officials of Grand Grano county at at- at attended attended tended a meeting at Price Friday Friday Friday Fri Fri- day evening which was called by State Engineer H. H A A. Linke to go over a plan proposed by bythe bythe bythe the U. U S. S reclamation bureau for Colorado river development in Utah In attendance representing representing seating Grand county were Commissioners R. R J. J Flet Fletcher her Frank Shields and L. L L. L Taylor Tayler and State Senator Mitchell Me Me- lich itch reclamation Declamation bureau engineers explained the preliminary plans for river development in the state which call for fer two major projects the projects the Echo Park dam damin damin damin in northeastern Utah which proposes to divert the wa waters of Green river to make possible diversion for the Central Utah project and the Glen Canyon power dam near the Utah Arizona line When questioned Regarding possible development in Grand county the engineers stated that smaller small small- er projects such as the Mill and Pack creek storage projects could go forward simultaneously simultaneous sImultaneous- ly with the two major projects State Engineer Linke stated that meetings were being held in all areas affected by Colorado river development to familiarize familiar ize Izee the people with the river development situation so that the state might agree on en a plan and present a united front to congress when funds for upper basin development are asked Officials and citizens of Uintah Uintah Uin- Uin tah Duchesne Carbon Emery and Grand counties attended the Price meeting |