Show I CANYON SITE of Proposed Reservoir fled by The on reservoir site hoist and fl the action of time mayor city and city in lug condemnation o oti ti reservoIr alto In Parleys canyon It wits also decided o report to the cotta oil at Its next the steps taken In tue matter imi detail and will ask that the lii to further its investigations before inuRing a final report ci lie committee the progress made City Engineer stated that cite test pit has been and two others have been started At a depth of 10 feet shale was tIme engineer states Is it good indication that solid Is U fets feet deeper lie thinks that a reservoir can be built at lie place is beIng done of capacity to hold back all the Water of the canyon itt a moderate expense SAFE rho license committee the die evening that George A one of the violators of the closing to whom tim on Tuesday bIght decided not notIA IA issue a new liquOr license on 16 into the city treasury the required sum for a license and hence it Is impossIble to discipline him until hint expires will i the middle of r The dIscover quite a a lie as It was intended to appear before It amid promIse obey this liquor ordinance before lilt license |