Show transfer transferred dewey site grand river cost SERVICE TAKES GRAND COUNTY PROJECT re ECLA NATION cia service boulder canyon site prove feasible transferred utah annual report secretary john barton payne interior department next site reclamation service event too expensive get down bedrock fit boulder canyon dam dam darn site dewey utah report dewey site grand river near station denver rio grande adequate reservoir site found control 41 per cent flow colorado river green river 35 per cent flow colorado mouth 21 per cent being added lower down river fremont san juan utah gila arizona warm spring take place mountains utah wyoming colorado green grand brought flood stage often case reservoir grand flow green permitted continue way without serious threat disastrous break sea december 30 attention fact secretary bedrock sought yet found Boul boulder tic canyon site thus aft report topic specific best method imperial valley california until examination boulder canyon site secretary interior submitting report congress report goes gable area whole united states reclamation service transfer utah near future take project grand county dam grand river dewey given john barton payne secretary interior salt lake tribune friday issue intention reclamation service transfer local project tribune article united states reclamation millions re air 1111 serious re g ri however maximum power develop large reservoir boulder canyon near northern boundary arizona below mouth virgin river report basin large capacity dam thus far however shown foundation dam case boulder canyon reservoir prove feasible riot pro 8 possible site minimum cf 1580 1580 1560 storage lent position dewey reservoir grand river together necessary cat cat crt power total expense latter project itt report attention fact possible upper storage dewey reservoir shortage water certain yeah twenty past report rue colorado river flood control few ago mention dewey site name mention possible power grand storage fall below second feet during head feet flow 1000 second feet brake horsepower power lev stream grand river whore ia same dewey ferry twelve september 30 1914 mean 1800 re en ed wit increase grand tributary gunnison Gunn river minimum flow occur august september flow 2000 feel feel feet ca ore ore ere bract burn sufficient capacity dam feet air rue mean flow basis air rue west west went water site site grand river ten below road station grand county utah water level dam site feet without damage roadbed denver rio grande railroad head feet power able minimum flow present cat |