Show G Of THOMPSONS ROAD POSTPONED UNTil PRING PAIN ng operations on the highway 0 EMri to Thompsons and on to which commenced 10 days ago een n postponed until next sprin sprino o the cool nights and the diff of obtaining a proper mix of oil gravel J W oiling mUng con con- conr conI I r had started work on the see sec between Thompsons and Crescent Oiling of this SIX mile strip wIll bO be this week before work Is IsI J I Great difficulty was had in w ng the oil mixture due to the hat bat a heavy grade of oil Is sped sped- which added to the cool nights it extremely difficult to obtain root t I Ie e oiling will be resumed next g probably in April The gravel gravel- t of the highway from Cisco to toI I and on as far west as asbe ElgIn be continued this fall and winter reparation for next spring soiling s oiling alga aign |