Show BIOS BIDS OPENED FOR PAVING OF GREEN CISCO RIVER CISCO ROAD The state road commission on Mon Mon- day Monday op opened ned bids for the graveling and oiling of highway high No 50 from Green Green- river to Cisco a distance of 43 36 miles The project is divided into 1 four sections Twelve T bids were vele submitted Olof Nelson at was HiS the lowest bIdder under one section which pro pro- sided that the whole of the project be constructed by the plant mix method However a combination of bIdders under another schedule e was lower J M JM was lowest on schedule I 1 whIch involves a sub base and gravel to a part of the present road his fig fig- figure figure ure beIng 40 without allowance for inspection or engineering W W Clyde Co were low on schedule 8 covering the application of gravel to the remaInder of the stretch at 80 and Mr was low low- lowest lowest est on applying oil to the gravel gra and mixing it on the road to the proper consistency for Cor an oIl gravel mulch treatment This schedule was bid at 37 The contract was not awarded a Mon Mon- Monday Monday day but it is understood that Sum Sum- slon sion and Clyde will be adjudged the successful bIdders |