Show lAYING OF ASPHALT SIDEWAlKS STARTED ST ART EO Work started this eek on the lay lay- laying ing of several blocks of rock roch asphalt sidewalks In the town of Moab The alk extending from the First National bank past the county courthouse court court- courthouse house to the school property will first be surfaced and later other walks walts inthe in inthe the business and close m residential district will receIve attention Practically all of the sidewalks In town sere ere and graveled last winter by the C W A and are in per per- perfect feet condition for applying the asphalt Lumber forms are being installed and the asphalt is being applied to a depth of tao tv 0 inches It wIll vilI be leveled and toiled lOlled The asphalt was purchased last win win- winter winter ter by the county and school district and was hauled by C W A labor laborI I About tons are on hand sufficient lor br eight or ten blocks of walks The I material must be applied in hot hotI eather eather I The laying of the asphalt is being done as an F ERA E R A pro project ct At present only a small crew of men is employed but within a few days the force will be increased |