Show LATE developments mcfie OIL FIELDS utah southern oil co moab consolidated soli dated oil co frank shafer mo 1 can creek dome section 6 27 21 discovery well of moab district shut in after pumping sufficient oil for drilling of john L shafer no 1 A john L shafer no 1 A section 36 2620 26 20 the first flank well on cane creek dome halt a mile north of discovery well drilling at 2660 feet in sandy lime gas showing colorado river Is still ice jammed and supplies for camp are going down river by pack train king no 1 salt valley anticline section 13 23 20 bottomed in limestone at feet it was announced this week that an agreement between utah southern and utah oil refining companies had been consummated for deepening of this well and that work would be resumed at once worth no 1 pleasant valley structure section 2941 29 4 1 14 miles from myton utah drilling below 2400 feet navajo petroleum state no 1 cisco dome section 2 29 21 bottomed at 2845 feet in cappock caprock above objective sand and operations have been suspended for three weeks on account of cold weaker end ii f of waie line drilling crew is back at camp and expect to resume work as soon as weather moderates which should be within the next two weeks petroleum cowell co well no 1 barrier creek dome section 16 27 16 bottomed at feet tied up with fishing job are now drilling past tools and expect to have hole in the clear in couple of days sandbag sandbar Sand bar petroleum co of utah sandburg no 1 section 7 21 19 on north flank of crescent dome will be deepened by sandburg company backed by signal petroleum corporation of california bottomed at 2475 feet up now in progress and ex hect to start operations within two weeks J T smith has charge of operations erat ions boulder knoll oil gas co endter no 1 boulder knoll structure section 17 34 25 bottomed on top of sand at 2640 feet operations to be resumed as soon as weather moderates well continued to make heavy flow of wet gas western crude oil cathis Co This company will drill a test well on cisco springs structure approximately in section S 2023 20 23 about ten miles north of town of cisco rig has been obtained and it Is reported that work will start in near future brendell oil gas co brendell no 1 crescent dome section 9 22 19 rig erected hole studded spud ded and permanent camp built company announces that series of wells alu be drilled on acreage leased from cres cent eagle oil company which brought in a small flow of oil in its no 1 well located feet north of brendell no 1 manager of brendell company returned this week from the east and it Is reported that operations are to be resumed soon crescent oil syndicate mccarthy no 1 crescent dome section 27 21 19 formerly drilled by western states and intel mountain venture compani les will be completed by this concern bottomed at 1602 feet objective Is dakota sandstone expected within feet new equipment being moved in iba six OU co utah oil refining co bandall no 1 crescent dome section 27 21 19 closed down at 1710 feet with fishing job cisco union oil ga cowell no 1 cisco anticline section 20 21 22 rig erected and hole studded spud ded |