Show LATE developments in the OIL FIELDS 6 w MOAB OIL FIELD DRILLING REPORTS utah southern oil co moab consolidated soli dated oil co prank no 1 cane creek dome section 21 discovery well of moab district shut in after pumping sufficient oil for drilling of john L no 1 A john L no IA I A section 38 2620 26 20 the farst flank well on cane creek dome half a mile north of discovery well drilling thursday noon at 1885 feet in gray sandy lime several strata of black limey have been penetrated the past week well is making occasional showings of petroleum gas eight inch casing will be run shortly to shut out water before drilling into objective horizon expected from 2000 to 2200 feet well Is showing considerable life and the prospects are considered very encouraging kins no I 1 salt valley structure section 13 23 20 after being closed down for a month operations on this well were resumed the last of the week the fishing job which had held up operations has been successfully completed hole Is now in the dear and drilling Is under way depth thursday was feet A second well on cane creel dome Is on the program of the utah southam moab consolidated companies but probably will not be located definitely until after the john L no 1 A la completed farnsworth no 1 pleasant valley structure section 2941 29 4 1 building of rig practically completed and well to be studded in within next week or two boulder knoll oil gas co endter no I 1 boulder knoll structure section 17 34 25 bottomed on top of sand at 2640 feet operations being resumed hole will be un der reamed for lowering of 6 inch casing to shut out water well continues to make strong flow of wet gas navajo petroleum corporation state no 1 cisco dome section 2 20 21 bottomed at 1825 feet rig being repaired preliminary to resuming operations erat ions bl six OU co utah OU hennly co randall no 1 crescent doie bertlon 10 22 19 drilling th aday at 1725 feet in la plata sid stone A fishing job delayed operations this week crescent eabie on concu no 1 crescent dome section 4 22 19 shut down at feet hole has been making email flow of oil with water for nearly four years brendell oil gas company of mckeesport McKee sport pa have leased crescen eagie teagie t acreage and have started new test well feet south of no 1 brendell oil gas co brendell no 1 crescent dome section 9 22 19 standard rig erected and well has been studded to feet drilling operations erat ions have not yet been resumed intel mountain venture corporation mccarthy no 1 crescent dome section 27 21 19 bottomed at 1602 feet preparing to run 84 inch casing continental 00 cob co B 0 u n d a r y butte structure section 31 24 21 bottomed at feet this well encountered production of about 50 barrels in sand which was cased oft in order to carry hole to test the pennsylvanian syl formation no report has been received from this test tor a number of weeks last report stated that dr illers were sidetracking lost string of tools crystal carbon co company s tenth gas well on cisco dome Is nearing completion it Is located about a mile north and east of well no 9 which canue in with a gas production of 7 million feet cisco union oil A gas co well no 1 cisco anticline section 20 21 22 rig erected and well has been studded in this well will test a structural high about halt way between cisco gas field and the shallow wells at cisco town which made small oil production when drilled several years ago petroleum cowed no 1 barrier creek dome section 16 27 16 drilling under feet in sandy lime it Is intended to run 8 inch casing at about feet it 10 lich hole can be carried that far texas production co shapley no 1 sweetwater structure section 5 27 14 abandoned at around 2975 feet after hole was lost through unsuccessful fishing job CoTi pany Is applying for extension of to on its permits on sweetwater san and Is making a further and examination preliminary to locating a new possibly to be located on flar d structure the opinion Is held th the no 1 well encountered a alt and the heavy gummy sticky found in the well lends encouragement coura gement to the plan to drill a new location navajo OU co of california this company Is reported to be making arrangements range ments for starting a test well in the boulder knoll section east of mon company has acquired large acreage in this vicinity also on the lisbon anticline |