Show effects biff savin H J Nl elsen resident state road engineer was in from the cisco road camp over sunday for a visit with his family mr reports that the federal aid project from whitehouse to cisco is well under way and already two miles of grade have been graveled the construction of bridges Is also progressing it had originally been planned to ship the gravel for the project by railroad from floy a distance of about 50 miles after assuming charge of the project for the state mr made an investigation to determine whether or not a local supply of gravel could be obtained he had several test holes dug and found a large bed of gravel about a mile west of cisco this is being used and there is enough on hand to gravel many miles of road the discovery of the local supply ot bravel will effect a saving of about 10 on the whitehouse casco project |