Show RAL OIL both thi th re scent and moab oil well are getting irett lne reidy ready to resane boing cp p ration following delay delays ik at crescent where oil wae wail jmj j two bieke eks IKO agoo mhd I 1 now band bee heel 1 and 1 l band u line ne were received ebed ait week end and are becj be installed pa riff rig will probably be in n operation IA evening or tomor tomorrow and the at of the oil houlne showing recen recently tit en on ant tred can be determined As soon J the ali new part parts are in n place the biler wet wll be run to find out just alt r daich oil u standing in the well ruch after the sands nil were tapped two weeks ago K oil 0 raised feet in the wen it Is stated kt bl as a possibility that there may bo be somo some water with tu tw oil although the bole hole was dry ihen witz the drill hit the ands sands the drilen are confident that production kg been secured cured Be but the bit will probably be cent sent further into the ach to increase the flow at the big bi six well at moab a cbill leak 1 in the pipe necessitated i ji tedious job of running and sand around the asing to oud off the water flon flow ad ad thi this has ba been completed sat batis donly fa the well will is now being awed out which will require sever il dayi 40 longer there are a few d of iron in the hole which will have to tp be b drilled up the well has been baad out down to around 2600 2 feet it is inured figured that the hole will be cloned and nd ready for drilling by the riot rat of the week weel the gas ga pressure s exceptionally strong error et and the pas ps bum s beadily steadily tea dily when in inird |