Show RAPID PROGRESS MADE the new well of the monumental I 1 oil company in the san son juan field being bein put down with a diamond drill by the longyear exploration company is already at a depth of 1000 feet and the drilling crew is now idle awaiting the arrival of addrion additional I 1 pipe and boiler equipment this I 1 passed through moab yesterday on moab gafare company trucks and will bo b at the well site in a day or two with the new equipment the 4 diamond 1 a mond drill can put the hole bole down t two v io or three thousand feet f t |