Show IN ILL WELL TO 10 BE IN div ry WEEK hig in arick alace and drill will be bounding away in L I 1 ew days of next week a 0 ky by thi th 1 r part 1 wh h a 44 il be pounding pound 1 its it way et of ol 01 at the HI to the de t ln in I 1 ration company camp 5 the 1 1 io 0 below wor moab f 1 arrik bruk has been erected g 55 09 en 1 ii 1 rig equi lUP ment 11 10 have 1 in 1 1 and tool houses 0 have cit 1 and 1 I only ly a few ew more n con juiced to complete com the jsn iv v A h YS to spud studding ding f er W i rf r lini inary the the ild J bc i pounding pou nuin away towers will be for a A in ill and s means that the hole fast porsi possible seible ble 1 ill j g lust lilt as po 1 fh th ummer the bit should be nl i territory a pr r digs G it field superintendent 9 nd A 1 ud driller were here up I 1 Nest besterda erda and report rum dim j th is 14 practically in shape A few minor 9 r ril ri r notions the installation of a ri the river and the d air the electric rec ant lant r t be completed before udd i the two rip rig builders pit F i 11 and D 1 L lessenger ame 1 l f in the camp yesterday ay iy f nd lef f denver iener having completa sy thy the r rl rk pra ill of the drilling iame f r the camp is now on i 4 khe gr u with the exception of the tr r moab garage company art 1 as tr arted nil all ot 0 the heavy 1 tului Tl illing lui ia 1 to the camp and the work ork f nir ing tho the casing will aill start 1 a da dan r two there are five car 1 oads f sing nit to be moved include 20 1 kt S 12 10 8 and find 64 inch ere are 1600 feet of the small for the well uell ne alf ah all garape garage power barye barre con ties IM t perform beautifully and to ate about tons of equipment nd upil PS eq have been moved down r to the camp imp the boat will un ergo a few improvements the last nent I 1 this beek A pointed prow has een constructed and this will be in arved tailed sunday it will enable the at to ride the waves better and will e possible better speed both own and up stream As soon as the equipment is at pe he well ite the garage company will mence to move fuel gas and oil e lare laree four cycle gasoline en e A h eh will furnish power for be in rig w 11 consume about gal ons on of asoline gasoline daily dail kerosene will fit used fr fuel for the forge for par ba penin tools and around ions v wll 11 be required each day e garage company is making ar cements to transport the gas and sene to the camp in large quan es ies and probably one boat trip a ik k will be sufficient to keep the P supplied with fuel with the studding spud ding in of the he mid est LA well wet on the big six dome wh which ch i 3 aid said to be one of the most perfect P U structures in the U united state states west erest in the oil possibility of this wity vw rise to a fever feer pitch 9 to the exceptionally favorable olo 10 9 giral 1 call conditions the ri ner er oi oil 1 now ome offers encouraging probability iea 1 that a commercial field will be med all up oilmen throughout the west will watch the di drilling rilling of the oe v th intense inter interest cst and the I 1 ringing n of an oil well will doubt less pre petate one of the greatest on u booms the ever experienced in wt est due w to the size of the field and the e imm nse production that will re sult f i saturated maturated sands are MD PROGRESS MADE ADE kt T CRESCENT aloa wm hut t steady progress is being zade de i the he crescent eagle well ac cording wain to word from that camp re ed at noon today the drill is at lt a dath of fet feet and the ver ven hard d formation encountered last k I 1 still in evidence less than a foot bhole f hole per day is being drill ed h s it t he b bit t is gradually working f N d anward W F reeder official uricial f the company who is at the caina f the opinion that the stra tura w 11 be penetrated very soon As SOO ana 21 the hard capping is pierced 1 mr I R appi der of loog looks for a bip big flow 04 v th ohp well is still flowing salt wate er and oil the amount of oil in rei during the week and this 1 ind ates that an oil sand will 4 e countered immediately under rieste the hard stratum drilling is again under vay ay at the so ico no 2 well of the utah oil re fining olix q inch casing g aas aa run o 0 the amt at f the week to a depth of 2700 feet wt and new hole is being cut drill ing 1 I it st also RO under way at the anz ariz th well ell at cisco town opera luns heing wing resumed at a depth of 1000 awu ft petroleum is drilling at ath depth of around boo feet after tonn 15 inch casing this well located on floy structure four 1 rth west of crescent six manner P r W strong of the big o 0 lt left this week for salt lake to inake arrangement enu looking to the carl resumption of drilling on the veil on the structure bie big six up the 6 west of town mues mile three carried down will nill be hole inch and tha the well feet further furth r ablo the hole is now i will vill then be cased of 2900 2 feet I 1 at a depth |