Show aa DIU M MILL SOON READY FOR OR RUN th vanadium mill of if the tile united ettes compan comp nn which has been in u arse of construction const rution ot the keama kearns clams in dry valley for the past several months will be read lor tor a test nin run within UM N next text week to word from the camp of the th machinery ia is in pl e and will vall very shortly be ready to five the vanadium reduction re luction pro cesa cess ft a try out water for use in the mill has ben beta obtained by sinking a veil it everal hundred feet ft while the flow is not sufficient to operate the mill at lit capacity it in is sufficient for a R test run A second will t U IK ill being drilled 11 II R moly superintendent of the ll U S company tumid to the camp last Sa saturday from denver L R stele engineer of the company left the last of the met awk k on a busine tn trip to denver |