Show OIL FLOW INCREASES WHEN MAJOR SAND IS penetrated AT CRESCENT 1 1 I I 1 IX 14 HE 11 1111 ON N PI III ml III INO 1111 1 01 I 1 A TO IN IN SUNDAY CISCO NO 2 s JOB ING IN I 1 11 1 1 10 OR ES RIVER IF FEST cl 11 that on tilt ri ristine stint bagli alii 1 l frill him hits pent it 11 major mind sand luid and that tin n increased fiew nf or oil mm in atun hill thi tho stratum w will sm the ritt rudard ived from froni nn tilt bourev nl tit CriK cent hist night oil is 11 no now standing to A n becht of if 2500 2 fret feet in ili tho the well the luran liming knicl considerably I 1 ih last ln or two chils of th lagh company nn art positive t that they havi it producing anil and ar nn no now making nt to put th thi well ell on the pump to ascertain the of the flow ie is being accurti from front salt valley and R puni pump will be installed in n a day or two to it is 0 impossible to di termine the volum of thi oil li it wt of the fuller I 1 on tin account of th thi extreme 1 hi I I 1 th h of the hole F r it imi time imp past iti tilt well hato lon been it great dealt of if oil off the drill d alternating strata of sand and shale an annl I 1 thih this mook cut it I 1 tn in what appears to to bf tv an oil sand f considerable inith ith the nw now tand the oil chantrey chan tred to a better bality wa lity of f crude nil I 1 tilt oil level faiq rai daiil il teil this leada the drillers drill ern to that tik tho bit hn has at lat la t encountered a sani of sufficient thi knee knes t vin tilt lf rom com n erml production nut but slow in trilling Irilli nR is i being ninde nt tit crescent due to tro the extreme depth of hole bole only one r two feet being a made a lay it 1 n I the belief of the officials of the company that the well uell has ha no now brov aed d th fidd ann and that the crescent I 1 dutil distrait t 1 is now on i producing basis drilling OIK rations at citco cisco mill 0 o 1 2 of the utah oil refining corn com party aill ill not bo be ti for tuo or chri e days dayl the times independent wan 1114 advised vir the phone today tuat th frilling cn cram had completed the of 0 10 inch at around the 2000 foot level and sev cral days will be to allo tl th ament to act set the drill is i ap I 1 parlin I 1 act ing the expect expected Nt prod production ution ho and tern t vr ern it 1 aking I 1 prevent th ill running v irl id lit it t th lit dr drill 11 pi the si it I 1 in lit N 1 which aich came can in a no xio foot ga aar ifer th ill ran will vil I 1 fri fot so s nn nit time ind and th tb gas wi a finati ignited by ligh trang resulting I 1 i th destruction lett lest ruction of if the rig 11 jh if f muth a situation in V will it I 1 prevented vented ahm the dull i the sand the eating casing X 11 be he capped 1 A fv lays 1 drilling trilling should take tl it I 1 t I 1 the 1 kand sand will no 1 2 is baing 11 sunk lower n the structure than 4 1 tin and hith hope hopt are hild i ut thit that a orn merciel fl nw f oil d 11 iome binm in with the gal A cot mil I 1 it u I 1 I 1 I 1 I 1 i tit 1 fir I r tit midwest r tin pany reach tal V Thomp sons th first of the nel in is being win brought to moab by the mobil uana truck tho equip nuil rant include it homi hoin tin en ollie o 0 attain boiar 1 nim olim en kine eind other mitchiner for thu tho mid milled midat at tf st on in the th colorado 11 reveir lidow monh it will it 14 moved to the drilling site juet just As son as the river ewt t n and tho moab lair alro com phiny argo Is 1 in operation during Pu the past kw days iho the ar r blis bein cohar Antl jeru are nit prospects of tho the ko ito ill up and it lit 1 likely nat the burge will ivill be rendy fir for the water by the time the hafl isolen I 1 open the louche touches tire nr now bo be ing given tho the bip big loat boat and nl it will N read for launching within a awk aek tho copt ha has liten painted rand the aror of installing the engine wid lini I 1 die hicl heel hi cl will start within a fi or two it is expected that the vort I 1 oat will mill be completed by the latter piert of next week in tr 0 the carlond carload of P arpid rp id tint week tho the midmost lidit lid tt has hi fiat other car 14 1 adm ads i f mote rittiA en rout to thomp aminti and nd they should arrive within tl tie e coming week eek the M idlest lit baing anlo weil juit just bei the river briol liri dico fco where the far car nc ago company IH is constructing a it load ing in pier and has built a camp house the curag is today com g erection nf of rt loading platform pil pill in lit it are being drin nion the river lank and a platform will be buhl built on these those that the heavy machinery inn tan bo be loaded onto the boat from the platform by meana means of a derrick derri cic which aich bat been installs in the construction of a telephone inn lint from moab to the oil camp crimp down tle be la is uell under way aay mana gr J 1 corbin of the midland td tel rhon company stal that tro tlc poles pole in ha I 1 lien t en st mt t for mile miles of the tin and the work mork of stringing wire i going 1 forward about three week weeks time aill 11 be reou required ired to in install atall thi phone line th sandburg Sand burR petroleum company compan t utah which has ha established a amp in hoy canyon seven emilei arth rth nf of aloy I 1 loy station hag hats practical 1 iv com committed pitted the arttina of m atchin eo er and will spud in it its firt well on sunday february Fehr uary 16 15 it is the inton tion of the company to put the well iown with all po poss sille le apted the san II 11 camp I 1 about ten mile f if crescent Cres cont 1 |