Show RW CABIE ARRIVES AND IS ONDER WAY the no new flow drilling cable for the th dig big six oil well arrived tuesday lues day and yesterday et erday at tue well er resumed alter after a several day days curing outing the suspension ine Us rig boiler boller and tool tools were over hAll hauled ltd and gitil a new now cable and and sana line the ng rig is well equipped tor ter A long run me ins bottom ox of ino tao boi hole for ft a distance of some twenty or craty ie lee lud nau bridged on account ot caving aunno the anut nut down but the baud mud Is fait fast being baled out and the tool tools will doubtless bo be on 00 the bottom oy tonight hiar manager iager V F W strong an and oyd driller john tannehill fan nehill intend to keep the ng rig in continuous continuo ul opera lion tion iwo two twelve hour tower towers being worked and rapid progress towards competing the nole should be made hen operation operations dihe were suspended impended pending ane arrival of the cable the toola tools were resting on a bard hard stratum thought to be the cappock caprock over the oil lands and the next weeks drilli drilling nir will be watched with interest few reports have been received from the san juan field during the week the material tor lor a barrel refinery for the well brought in by the bluff oil uil company has been shipped and should reach Gallup N M soon the refinery will bo be erected at once and the company announces that it will supply all ill the local demands for oil and gas as well as fuel oil for further dr drilling illint in the field mo no news has been received as to the progress of the fishing job in the monumental well the midwest oil company which intends to drill the boundary butte structure is doing a great deal of road bori work so that care cars can reach the district and it Is announced that the company proposes to in preparatory work alone out at crescent operations are under way casing Is being get set to shut out the water A large rig capable of ca carrying 7 in 1 the hole down to the required depth ept to test the structure will be installed fit at the cisco well of the arizona utah oil company according to P F dyer of cisco who was in moab the last of the week wee k it i Is understood that the rig has been shipped and will arrive in a few days mr air dyer was not certain whether pie the rig is a standard or a large star the cisco well was drilled to a depth of about feet with a 8 small m 3 11 m machine A chine which reached its capacity before proving provin the true ture some very favo favorable bratle oil and KM RAS showing showings were had and the of of 0 the company are confident that the hole will come in a producer es 22 soon as sufficient depth Is attained |