Show I READY HEADY IN MARCH I With A Copper to 10 Production S Kii i Manager Charles H 1 of ot the thelah lah Copper company re returned reo returned turned from a trip to the tho Washington county properties of ot that corporation this tills morning where he states the thu weather was as balmy as at southern suther Cal California CalIto Ito rain Preparations are going ahead Mr Ir said elid to the tho N w WI for tor the re ro resumption lumpton of production upon an nn exten extensive sive scale about March 1 I The smelter wilt will wil also be ho placed In ill commission about that hate date The connections between tho the new MW tunnel nail and the time old workings of ot the mine were made male last In t December The Installation of ot machinery Is Ie now In progress |