Show STOCKTON DISTRICT KEEPS MILL BUSY The company and leasers In Bullion Coalition are are working a force torce of ot approximately ap proximately seventy five men Large bodies of ot ore are being developed in a winzo from the face of ot the tunnel which is in approximately feet teet The first grade ore runs from 50 to 60 the ton while the second grade product is valued at about 20 the ton The Dry canyon canon section of ot the old Stockton district is producing sufficient I ore to keep the Bullion Coalition Mines mill in operation regularly The Dry canyon mines are producing an average of fifty y tons n of ore dally daily averaging g from tt ra sW sWand 25 to 50 the 1 ton largely iya in lead silver and zinc |