Show ASPHALT MIXTURE NOT SATISFACTORY p. p 3 J. J Moran oran was forced to close his asphalt plant t temporarily t yesterday y afternoon afternoon aft aft- because the city engineer was not satisfied with the grade of ot asphalt being belg laid laid on Fifth South street under the new specifications The he eTl engineering department depart dopart mont ment said ald that too much sand was being used In the mixture The plant resumed operations toda today after the tho mixture had been bean ch changed to conform with toe IPe specifications |