Show TABOR TADOR CANADA DROUTH laIr Crops low Now oe Work on Now ov l Special Correspondence Tabor Alberta rt Canada Aug 3 The drouth IH is broken and the rain rail will wil do Oo much toward out tho time gaulli and assuring fair muIr A force of at men are engaged on tho time new nIl 1 under the tho direction of ot Mr Mi 11 Van the contractor Tho rho large water ater tank is now nw computed the tho s d company rou dy h allows those tho e hero who have no 10 wells Wels to II use u e front from 1101 time the tank ttumi for purposes |