Show If EUREKA REKA STANDARD J TO HAVE POWER LINE LIME De Deo 14 H. Arrangement havea have k a mae made for tor the th immediate construction s power line to the property prope ot or the Eu- Eu Standard company where some MIme dof de- de i. i 4 f work t h. h now under wa way war Th The tt ot of ai hl property Is la ben reid re- re l' l id sad and enlarged and new nsw electrical 4 neat lIt la a no now A be I nit Installed 1 1 round rond ll lies a lo 10 o th the south mouth of ot the Tin Tin- a and E. E J. J la is In control i said that the present campaign campan of work but J. J In ID the nature of ot annual assessment ment at Ua there ta I. 8 a possibility of ot It being ng Conk con con- k McI alter the amount required for tor thin thia J b baa been completed About feet w power er line will be needed eded to con con- Standard works with th The I MIme time ago ao was wu built bethe be- be tit the Standard and the South i |