Show New cw The rhe superintendent states elates The track layIng forces have made Rood gout 1001 pr r during thu week just juist and ond by b tonight the truck should Im ho within 18 1 mil a of ot Tonopah Material still continues tr to bo bl received at t the role rate ot of of or a mile I h 1 per tiny day WI e arc might and from ruin Deep Deel Wella ella in instead stead of or t the tho stage will con ti uit to III run ruin between bet that I ha t point t multi and Tonopah until mich time UN suit the thus track macic Is la completed It to another station will be b established The Tue depot site Mite Is III completed anil Is II Isnow isnow now In shape for the contractors to lO be he beKin Kin gin work on the depot and build buildIngs Ings Bonanza |