Show BOARD GiVES CONTRACTS Boxelder County Work WillBe WilBe Will Wil WillBe Count Be Rushed to Completion BRIGHAM BRIHAM CITY Aug 6 The S.-The The board of ot education of the tho county school schol district opened bids bide yesterday for the completion of f tho the mechanical arts buildIng building build build- Ing nt at tho the Bael CI High school and tand the addition to the Perry Ferry Perr school schol build build- buld- buld Ini Work York of ot both bout Jobs job was wa previously previous previous- ly h started but was ws stopped by Injunction tion ton several leveral weeks weaks ago b because use the work had jd hd not beo been beon awarded on bids C. C O. O ChrIstensen Son was Wn awarded warded tho the high school building at which was 70 10 lower than Ulan tho next lowest bid bidder bidder bidder bid bid- der and T. T W. W was waa awarded the Pery Perry building at 91 which was WA also aleo 70 lower than the tho to next nat lowest bid bid- der Construction work on these buildings buildings build build- ings will be ed with all aU possible speed In to complete them for school use this season |