Show AlTA TUNNEl FI HAS lET CONTRACT fOR fEET Fred V. V president and general manager of the th Alta AUa Mining ning company has signed a a. contract for tor feet of ot driving in this long bore which I has attained a length of 1800 feet from the portals portals' portals portals-iii In hi the Silver Siver Fork ForIe of the Big Cottonwood canyon This contract calls cs for tor a a. performance of ot feet teet a a. month though it I. I Is I expected that with lh three thre shifts the contractors will i complete their work ahead ead of the tle schedule Mager Manager Bodfish says that within the next feet teet this tunnel will cut four veins All AJ these veins have an east and ad west course coura and ard dip to the north while the tunnel is being driven to the south A depth of ot these tese ore bearing veins of 1350 1150 feet teet will wi be attained and the greatest greatest greatest great great- est depth eventually In this drive across to the Ata Alta side of ot the ra ge will wi be 1600 feet feet By fly energetic development this tunnel can be extended in under the City Rocks porton portion of or the Utah Michigan Michigan Uth estate by September of ot this The The- year Thelong long bore will wi reach the side line lne of the Prince lince of lof Wal Wales s properties within the next BOO OO feet the tunnel having reached the heart of the te Alta Alta Tunnel company ground goud hoar at this time The long bore is destined to cut all al the important ore bearn bearing fissures fissures fis fis- fis ures In that region and in addition additon to draining a large area In the Big Cottonwood Cottonwood Cotton- Cotton wood side of the canyon it i will i eventually even even- provide a a. drainage transportation and development channel for a a. large section of mineral bearing territory in both talan Silver Fork country |