Show TO FINISH HIGH LINE BEFORE NEXT FLOODS n The Tho construction of or the tho new high line around the Meadow Valle Valley wash on an the Salt Lake route In Nevada Ne will be completed completed com corn before the arrival al of af the tho spring fr freshet shet season and the tho road raad will be Insured against such mich a disastrous In Interruption Interruption In In- of ar traffic as It suffered last Jast year ear Material will be taken to the new line tine over the old line lino without delay an anthe and the work wark will be hurried forward so that It ma may be completed In the car I early spring The line lino now In use Is only temporary and will be used aa as an auxiliary auxiliary lar iary to the tile main line on the higher levels of or the wash The new lIn line lInO will be be between between be- be tween t fifteen and twenty feet teet higher than the old line and will be run at a level above the tho highest point paint reached b by the tho water last year car |