Show NEVADA JEi CON Will VILL SINK lACK LAC Ml SUAI SHAf LEVEL LEVE President Sam SRm M. M Levy of th the Ely Eli Consolidated has lias been heen inspecting th the properties o of his liis company compan near Ely By Ll Sinco Since his last Jat visit i. i a month mouth ago sinking sink ink ing D in tine the main Jain shaft shaf was stopped a athe atthe at atthe the foot OO-foot level oel nn and the drift sent t to the tIne south about feet For this en cn tiro distance the ore Inns has hat been followed from Crom the Zack shaft It I i is a cammer cia sulphide or ore n cr averaging iD better heter than 2 per cent copper with Irom 1 to in gold 1011 and and carrying considerable iron Mr rr Ir Levy JC is desirous of hain having sinking sink sink- ln ing resumed while the drift is lS extended The showing is gratifying rr and th tine te pumps aro aru handling n the water ensi easily He Ie feels that some sante important revelations tons will vi bc be made at still sti greater greate depth and is iS anxious to have havo this work worl done clone while the company ha bU has the mono mone money with wih which to prospect There here is 19 suo int mone money for present needs accord accord- ing Ut t to the tho statement given CU out am aUt I plans ns me zinc J on ou foot to place the company compan os in ir if better beter shape It I is hoped that this money w will be raised in time to lo prevent nt the necessity of further as as- The company has about abou shares in tho treasur treasury and these may may- may maybe mabe be disposed of in the east Ely ly has been visited by Ly a heavy snowfall followed b by extremely cold cole weather This weather condition ha has las caused some bomo delay in handling the ore from t the e N Nevada c Consolidated a properties properties proper proper- ties tics as tho ore cannot b bey bO handled a as fast as it i arrives from the mine From he the h e Ic tc e eight trains train of oro ore a day ar arsent are arc sent iowa down from the Copper Flat pit pi arid aud Tile the ore are has been freezing in th the tho thoc c CRTS rs irn requiring the use of dynamite to loosen en the e product up Ull so it it can b be placed laced in iii in th the mill mil The Tho steam plant plan 1 Van inse 1 kept t tic He concentrates from iron frees frees- in jag ing up titus thus far fl but hut tim the delay ant and money moncy expended in additional Ja labor labo or orriM riM atti explosives in getting tho the ore oro or ou out of f the cars elm will il add to the cost of pro pro- and d reduce the tho th output durin during tie the |