Show MIAMI COPPER WILL START MILLIN MItt MILL IN MARCH MARC MARCHA MARCA A great cat deal of disappointment has been felt by shareholders of tho Miami Copper company because of the failure of tho management to s start art tho the mill mi plant on January 1 as originally planned The latest information from the mino mine is is to the effect that all aU connections connections tionA will wi be made and the plant will wl be bein bein bein in readiness to limber up about March 1 A dispatch from the tho property near Globe Ariz is to the effect that rapid rInd progress is being made in the underground underground under ground workings of the M Miami mi Copper company's com Red Spring claim Trolley Troley wires wies have been strung trun in some of the main drives and in the best of the drives es dr in the tho haulage level leve electricians are aro at work The lar large e room that has been cut feet west of No 4 shaft on the foot foot level in which will wi bo placed the electric elec dec motors to supply the power for the haulage e Astern system is in fit in readiness for tho the installation of tho of-tho tho machinery Although h it was the tho intention of the them m na to start the concentrator first part of tho the year and men Inen were employed ni nights many delays delaY have been met and it seems le that the treatment of the ore will begin before I March 1 The non arrival wn of pope for the tho water lino hino from the pumping pump in ing station at Burch to the mill mi has been one of the principal causes of do- do la lay The new tramway from the concentrator concen on the hill hi to the tho railroad in the Miami townsite is approaching completion comple tion ton and should be ready redy in the next week weck Preparations are aro bein being made for forthe tho the erection of a dam darn across the canyon can yon you below the tho concentrator to hold the tailings from the mill mi A force of men menis menis menis is building a wagon road for the company com corn pany from Irom the power jower house to the principal prin cipal works This road will wi take the place of the one that will wj be destroyed on account of the construction of the dam |