Show FO FOR A DEEP CREEK CREER R ROAD AD The last proposition on the Deep Creek road problem is 18 to build in n from frum on t tic the le Western Vestern Pacific to the mines in Deep Creek b by subscription It will not cost ch to grade the thelOn lOn road and und there arc plenty plent of contractors who would grade the roa road and take half haIr their pay in iii stock The same can bo j done with the tics ties Old rails and rolling roiling stock can cnn be obtained on a few months' months time from either of half hulf dozen railroads and und and the freights will pay it all ull back within a year This was what we tried done when the right of of or wa way was open from this cil city Vc We hope the scheme will work It must work or the time ores oles will go the time other way to tu Nevada Jt it is up to this people peo peo- now imos' it will not be e a month hence |