Show MORAN GETS MORE RE PAVING CONTRACTS P. P J. J Moran city contractor was wa handed hand band bad bad- ed a a. neat little bunch of ot paving contracts last night by the board of ot public works The aggregate was This was nearly marly over the estimate made rado bIthe bv by the city engineer but Mr Moran Morn b being the only bidder the worK went to him at athis athis his own price The contracts contacts a sm are for asphalt to be bi laid Iad in m arlu various 8 parts parts-of he city Including in tn all six block blocks State street from Seventh South uth to Ninth Nith South Southwill Southwill will wl be paved First West est from South Temple to Third South and Eighth South from Main Alain ain to t State The contract provides provide that the work wark be he bedino bedone done dino this year G. G D. D Colburn Colbur and Peter were appointed on the waiting list of et In inspectors |