Show EXCAVATION JORI I NEARLY Raleigh Harmon the contractors for fOl fo forthe the excavation work on the new Utah Uta hotel building soon to t be ha erected at th the corner corer of South Temple and Main streets street completed their first contract yesterday three thre days ahead of ot time About Abut 2800 cubic feet of dirt has been removed at a acost acost cost of about 2000 They have a second sec see I ond contract contrat which they are rushing fo foward forward forward for for- ward with about seventy five teams team This contract calls call for the removal remo al o of more dirt dir in the southeast corner of tl the foundation in order to have a deeper deepe foundation for the boiler rom room thus makIng makIng mak mak- Ing log the foundation twenty-six twenty feet be below below below be- be low the level le el of the street at this point pint finish It is h expected this in dt twenty that y the t'S days contractors wl wm will Parkinson Bergstrom Bergtrom of ot Los Angeles are the architects and are busy working on the plans of the building The Te contract contract con con- let tract for fOl the building has not yet been be |