| Show OF OP TO S Schedule Surveying Kates Issued From Land Lali O cc Under Instructions from the Commis Cominis Commissioner of ot the tho general land olce a a new nw schedule at ot deposits required In con connection connection necton with wih official surveys ot of mining miling claims In tho the olce of ot U S B surveyor suroor general for tor Utah will take tako effect com cOin commencing with wih Monday November 11 U 1 as ns For lode claim f For lor placer claim 2000 0 For or separate 2500 For and lode claim em embraced embraced braced In one survey surey For upwards of ot three locations embraced In one OM the first locution location And Mu Mil for subsequent location 2000 2009 For or each lode claim lalm within and Included In the tho survey of ot a 1 placer 1500 er claim For certificate of ot 1500 expenditure ex of ot Improvements after approval of ot surey survey a t fl Should an nn amended order leue an additional deposit will wi be required U It will be observed that the now new nw I wi schedule of ot rates makes several hong chang changes cs es viz vh an Increase ot 0 per location for tor a 1 single location or for three loca locations loca embrace In mono one group survey urvey It If I upwards of ot three locations ISO 30 only Is l charged for tor the th first Olt location and 20 0 for tor each cach additional Under the tho theold old system In vogue Ogue 20 0 for tor each loca location location alI tion was W charged chanel It I will vill wi also be ob observed served that tho the tS 15 5 heretofore charged for tor sef each conflict has hs been dropped which In the majority ot of cases will wi re result reo suit sult favorably to the claimants The Tho new now schedule of ot rates rate In Is II made malc up Th to conform an nearly nearl as may lay nm be bo to thu the rates adopted n In aT an other of ot ofU ofU U S surveyor or general In the United States and Is less lel than In rome gome Iome other States |