Show I I I PILOT LOT II BUTTE PIPE LINE RUNS FULL I i CAP CAPACITY ACHY Special Dispatch A CASPER Wyo Feb 14 The The pipeline pipeline pipe pipe- line from the Pilot Butte Butt Buttfield field to Riverton is now running at full tull capacity ca capacity ca- ca of ot the pumps and the oil Is going through the line at better than 1400 barrels per day With Increased pumping capacity and heavier pressure placed on the line by the pumps this figure could be surpassed but there Is no Immediate need for tor this because t the line can handle more oil at present present pres- pres ent eat than the railroad can supply tank- tank cars for tor The Glenrock Glenrock Oil company has has has' struck another producer in the Pilot Butte field This new well Is making about barrels and with the added number of t recently delivered delivered ered for tor shipping th the oil from Riverton Riverton River River- ton to Casper this will enable th h h. h Glenrock to ship out Its whole production production pro pro- of ot the Pilot Butte field i iThe rI The Pilot Butte Dutte field was connected U. U up last summer with the railroad at af a 1 Riverton when the Illinois Pipeline company laid a pipeline down the theley valley valley val val- ley of the Wind river so that the oil oU from the wells could be put to pump- pump I Ing The Glenrock has about thirty wells In the Pilot Butte field and holds holds' the territory of ot all the acreage acreage I In that field |