Show CHEERFUL AT BU EOK Management Will Sink on Ore Oro North of Main Workings GOOD tim Ion lIlI ln I II Ito I ar of 0 Caribou m III I I Cu Co It l It not that thet same lm disclosures will be made mas In the Bullion In the near future avery thill that WAy wy at present The Tha fact that At a lh de of oC 1110 tet In the new shaft haft on the Muldoon claim the Iho chute chule hag been to extend north northIe Ie I considered very 1 encouraging nut hut this Is II nil Mr r Farnsworth said 14 today that bout about 1000 feet ot of pipe line I ii being Ina put In t to l with a toot hatt north ot of the main workings Ore Ont hi this hatt and It II III ItIs I Is th ho Intention to sinking th there Immediately In addition to 10 It a tart start will be made on the 1300 1100 and nd INO 1500 this week To accomplish thIs work the is II ordering some nl new machinery machine drills were roe recently went t out to the mine and nd three Jar on cites ha have been ordered this week 1 Two of Ih thee drills will III be started on the 1300 1100 level and one on the 1600 In addition to 10 this work the Is II In two Iwo places In the Iho Almo group There I new at Present In III the tho drift from the level of the mine but news new Is II ex peeled any Iny Ila day that the tho Muldoon chute h has b been n Intercepted on 1 that level Ivel which It Ii accomplished will open ollen a new mine mille In III the south end of the property ut of what I is being done don In the lbs group to the hue Welt veit or In the north ot of tile ii |