| Show MORE POWER ow FOR MAMMOTH Manager Two Power tI 0 0 4 J A D NOT 1 I oI 01 all II rha Jon of tha shaft Ia Il IlIn to In the root level which will lIe be 1 the tut tat tati tbt th of I two Wo or three the additional b it at the mIne Mai ar ajer t fe has h decided to put In III tWo IWo 1 power hollers for tor tilt lbs A one I na among amon nit ot at the Ihl near lIar future The the 1900 1100 I now flow down ai moat W to ID 2009 1000 abd as al It III ii In Inore ore are iii an tf Way AY It hu 18 I n thought PI ii secure more power to 10 handle ti which he lowe JI lI nr arc disclosing The bout I Is H for 2500 feet 50 10 that no nothing thing dalle III hi ary there With th boilers III fit pIne Mr fr syi he will bl be aWl aWi to tak Care nr It tile 0 ore tin the 2 I all atu 00 the 1900 where III li h I lu lii th the big ble gold old chute on tilt the 1500 level ThIs Thill dIU Ie Which I t big body hody ot ore orl on the 1 with some Olne ore II I now 20 feet teet nfl III Ii to tio 1 ronI Mr Ir Mcintyre aye to 10 out CUt nIT the ho 1500 Mr t ela much en over th on an thosa thole 11 says If thi th no une a for the lint of th time month Is 1 not flot unlikely |