| Show WAGON CI ASI S Or Ac nelll Hauled the Ontario Tunnel The work Cr discharging tle tIme Or ores of the Daly We t through the Ontario Daly tunnel line now commenced am and wi effect a considerable table raving to th the company A contract has bas been entered by which ore wil be hauled at the rato or of IG 16 cents 1 a tn top Ins ead of n 1 which Is the porte ported rte rate b by the tho old route route Time he hauling of at sup ples piles wason hack to the ml mine ne wi will elect effect 1 a astill still greater saving to the company The Tho who loto hither hitherto to wi will be out ofa job but their loss ml tory be a gain to at ant Inore Increased ot i stud II be put putto to work In the mInin ln th the per future Al All ot of this great t I Is mide pos b by the mie mile Cf spur pur leading t to time the mouth or of the tunnel J lInce nc forth the tho ot of the walon wagon road road can never affect the ore are output front the gret great st |