OCR Text |
Show Outlay fo Total $9.5 Million On Highways Finished, Current Jobs Involve 381 Miles Of Utah Road Repair Road project completed or reported re-ported under construction by - the atmt road eommiseton since Jan. 1. 1949, Involve expenditure total-in; total-in; W.52S.7S8. said department ea-gineere ea-gineere Thursday. Mileage involved In th 63 project proj-ect totals 381.35. A th department concentrated on completion before June SO, 1930, of 217 mile of project under construction. It alio turned plan- (8e map of projected Utah road eeutrortioa on rage a.) nlng faeltttle to K new program T of highway Improvement to start July 1, 1950. said H. D. Whltten-burg, Whltten-burg, road commission chairman. Of th current program, 20 project proj-ect hav been completed at an aggregate cost of about 12,380,000. Total Expeadlturs A total of $1,448,813 federal funds, (717,829 state fund and 123,05 county fund hav been spent on the completed project. Of the total amount of construction con-struction now In progress, 15,422,-039 15,422,-039 i on th primary road system, sys-tem, $1,48,944 on th secondary road aystem and $213,340 on roade being Improved undec state project proj-ect exclusive of federal aid, said engineer. Location of th complete projects, proj-ects, Mentirie on the accomDanv- in map by letters, and the coat follows: (A) Cattle Dale-Ferroo, 848,724; (B) Timple-Low, S56S,. 832; (C) Salina canyon, 8220,09; D) s&ntaquln-Juab eounty line, S2O0.57S; It) D,lta-Nvsda Stat line, 3,48S; r Mofltlcello-South. 8132,603; (O) Mllrord-Weat. 8133,-080; 8133,-080; (HI Eureka-Dunbar. 8200,293; (I) Payaon-Benlamln, 831.373; (J) Henerer-Weat, 8129.735; (K) Loa-Fremont, Loa-Fremont, 868.128; (L) Bear River-South. River-South. 884.085; (M Young want-Colles want-Colles eve, m.36; (N) Weber river brldfe. 889 522; 0 Boneta-Altamont, Boneta-Altamont, 82,875; P connection road Da U. 8. highway No. S to Painter Springs, 820.515; (Q) Duchesne Du-chesne river bridge. 33307; (R) Eaat Center at, Provo, 847,288; (S) Sun-nvalde Sun-nvalde to Sunnvslde Junction, 828,-882; 828,-882; (T various locations on Bute at. Salt Lake eounty, 831.944, and (U) various locations on U. a, highway No. 40, Salt Lake eounty, W4.778. - Pis Jests Vadev CsasHauUta Locations of th projects under construction. Identified by numbers num-bers oa the accompanying map, and the cost of each follow, 1 Kane Springs dusway, 8184.888; (21 Pin-tura-Aah creek, 8491.738; (8) Woods Croas-BountifuL 311.232; (4) Lake Point-Mills Junction. 3140,99: 45) Parleys canyon. 8437,884: (6) Nash and Cisco bridges, 3123,005; (7 rioy wash bridge, 8117,541; (S) Sage Junction-Leketown, 3134,970; (9 and 101 Bountlful-Farmlngton, 8798,81; (11) Provo-Pieassnt Grove. $393,431; (12) 8prlngvllle- Unark. SOU MS i 1S1 Elalnnra. South. 822,087; (14) Deep creek summit 8208,281; (15) currant creek revlalon, 3183.849; (18) Sevier Se-vier summlt-Ciendsle. 8394.123; (17) Iron Mt-New Caatle, 8320.282; (181 Sclpio-Levan bridge, 393.222; (191 Rooseveit-Neola Bridge. 328,-015; 328,-015; (20) Corinne-Lsmpo, 838.037; (21) cross roa da-Trenton, 3173348; (22) - Trenton-Cornish, 3102.236; (23) Elgin-Hastings ranch, 175,. -Oftur (241 Parasonah-Ortoa. 8292,-881; 8292,-881; (25) Chalk crack brldge-Coel-vllle. 838.128: (28) Logan-Mendoa bridge, 830,284; (77) Grantsvlllo Main street, 877,322; (28) Lehl-Pleasant Lehl-Pleasant Grove 3109,901; (291 various vari-ous roads In Salt Lake county and vicinity, 324.398; (20) Mt. Carmel Junction. 813377; (31) U. 8. SO and U. A 88, 838.543; (33 and S3) Uintah and Harrison avs, Ogden, 8583,013; (34) Sclplo-sevler county line. 8327,092; (35) Eaat canyon-Mt. canyon-Mt. Dell. 3120.303; (38) Wasatch blvd. Salt Lake eounty. 3152.513, and (37) Sclpio-Levan. 8531.790. |